The project involves the renovation and refurbishment of the HARA hotel in Chalkida. The building has six floors with a total area of 2000m2.

The project began in April 2006 and was completed in six months. The total budget was approximately 700.000,00 euros.



The project invoved amonst other operations:
General repair and renovation. Changes in the Architectural Arrangements.
Replacement of the water and sewage piping.
Replacement of the heating installation
Replacement of the elevators.
Restoration of the coatings. Interior ans exterion paintings.
Replacement of the internal wooden doors and the external aluminium doors and windows.
Repair bearing structural elements had been damaged due humidity etc.
Construction of heat insulation and waterproofing on the terrace. Replacement of the gutters.
Repair and strengthening of inverted beams on the terrace of the Hotel






Renovation of HARA Hotel in Chakida