The project includes the design and construction of the strengthening interventions of the building complex of Miramare Hotel in Eretria Evia, which covers a total area of about 3500 m2. The strengthening interventions involve the strengthening of existing vertical elements of reinforced concrete by increasing the cross-section with the application of new steel reinforcement, cast concrete and shotcrete, increasing the confinement of columns with carbon fibre fabrics, the implementation of shear reinforcement using epoxy resins etc. Interventions are also carried out at the foundation of the building,

The budget reached 110.000,00 euros approximately. The construction began in November 2007 and lasted two months.













Strengthening of Miramare Hotel, Eretria