The project involves the lowering by 0.50m (demolition and reconstruction) of existing reinforced concrete slab in a supermarket at Keratea, Attiki. It was carried out in 10 days in June 2013. The connection of the new slab with the surrounding slabs and beams has been achieved with the use of rebars anchored with epoxy resins.