The project involves the removal of the upper storey of a nine-storey industrial building. Due to the large weight of the segment (approximately 40tn) and the height of its location (about 35m from the ground level), the removal of the section was performed using a 500tn crane. The columns were cut using specialised diamond cutters.

ALFAKAT was the technical consultant of the project.