The interventions are part of a larger project. The requirement of the strengthening of the RC slab and some of the underlying columns and beams was the increase in the live loads of the building. The works included the strengthening of the beams and the slabs with FRP laminates and FRP wraps and the jacketing of the columns.
They were carried out between December 2019 and January 2020.