The
project involved the strengthening of the walls the foundation and the R/C slabs
of a masonry building with gunite in Pireos str. in Tavros, Athens. The total
budget amounted to 41.500 euros and the duration of the project was approximately
one month (July 2009)

Strengthening
of a Masonry Building in Tavros, Athens