The project includes the design and construction of the strengthening interventions of the a three-storey building in Thrakomakedones, Athens. The strengthening interventions involve the construction of new shear-walls and the repair of existing structural elements that were incorrectly strengthened after the 1999 Athens earthquake.
The construction began in June 2009 and was completed in approximately one month.