The project included the design and construction of the strengthening interventions of the a two-storey building in Artaki Evia, so as to add one storey in height. The strengthening interventions involved the re-design and construction of new the building foundation, the construction of new shear-walls, and the strengthening of existing vertical elements with jacketing.
The budget reached to 30,000.00€ approximately. The construction began in July 2008 and ended in September 2008.